Erskine Park Warehouse

Menard performed ground improvement works to support the foundations of a warehouse development in Sydney (Erksine Park), by utilizing dynamic compaction over a total area of 50,000 m2....

Wheatstone Breakwater

For this project, the ground improvements works were to treat the whole 150m length and 55m width of the breakwater (located in Onslow, WA) , which Menard Oceania did by installing 2,000 bottom feed stone columns....

O-Bahn City Access Project

Menard Oceania successfully completed the installation of jet grouting columns within a sheet pile culvert and temporary anchors to stabilize the ground for a new busway tunnel in Adelaide CBD, as part of the O’Bahn City Access Project. Working closely with our customer, McConnell Dowell,...

Perth Stadium

Menard Oceania in joint venture with GFWA were contracted to carry out ground improvement to the entire Public precinct encircling the new Perth stadium footprint. We achieved the design & construction of 20,133m2 of Dynamic Compaction and Surcharge loading, 8,000m2 of Prefabricated Vertical Drains, Controlled...

Melrose Dam

In November/December 2016 Menard Oceania installed a grout curtain in order to improve the Melrose dam foundations as part of the Tasmanian Irrigation’s Swan Valley Irrigation Scheme project....

Webb Dock

The Webb Dock project (Port of Melbourne) consisted in providing increased capacity for the container trade. To respond to the need of ground improvement underneath the asphalt area (20,000m2), Menard Oceania was awarded the installation of approximately 5,500 CMC, of 360 to 420mm diameter and...

Townsville Marine Precinct

As part of this Townsville Marine Precinct project, which provided a marine facility of almost 20 hectares (for commercial, industrial and recreational use), Menard Oceania was awarded ground improvement works, using Dynamic Replacement. This technique was the best suited to provide a suitable foundation treatment...

Tharwa Bridge

For the Tharwa Bridge restoration project, Menard Oceania successfully undertook Jet Grouting works on the one hand – with the installation of 185 reinforced columns to prevent scouring during future flood events - and installed 40 Rock Anchors on the other....

Telegraph Road

This project involved constructing a new four lane, three span road-over-rail overpass bridge. To improve the soil properties and reduce settlement at the bridge abutments and approaches, Menard Oceania performed shallow soil mixing of approximately 2,680m3 (average depth 2m) in the structure zones and approximately...

Port of Brisbane Motorway

For this project, ground conditions were very challenging (different degrees of soft soil, sand and still stoil) and Menard Oceania installed 5,600 Controlled Modulus Columns (CMC), as it was the best suited technique to this challenge, providing a quick, cost effective and environmentally friendly solution....