
January 22, 2018
In
Uncategorised
Return to projects page

2014
Menard Oceania was engaged by Built to design and install a number of micro piles to prevent
the uplift of the building when the weight was reduced. Menard successfully installed 10 micopiles over two basement levels.



Techniques:
Micro Piles
Sorry, the comment form is closed at this time.