For this project, Menard Oceania provided a jet grouting system that was designed to provide water cut-off (horizontal ingress) and stabilise/strengthen the future embankment for excavation works during the construction of the low lift pump station. 112no. Ø1.2 m jet grouted columns (780lm) were installed.

Techniques: Jet Grouting