Gerringong

For the construct of the 7.5 km upgrade of the Princes Highway Ion South Kiama, Menard Oceania was engaged for ground reinforcement works in the transition zone between the road embankment and the abutment of both ends of 10 separate bridges. We installed 2,100 CMC’s that were designed to limit the settlement in this zone with the design criteria of less than 18mm over 40 years.