Kempsey By-pass

As part of the upgrade of the Pacific Highway, the Kempsey Bypass Alliance scope of works included the design and construction of 14.5 km of four-lane divided highway from Kempsey to Frederickton. The project had to be constructed on soft soils with settlement characteristics. To minimise the effect of settlement, Menard Oceania constructed 875 numbers CMC 450mm diameter piles to depths of between 7 and 11 metres.

CMC Rigid inclusion

Other projects